Client
Location
Built Up Area
Share
Services Provided
Air conditioning and Ventilation, Drainage, Water Supply, Fire Fighting, Lighting, Power, Fire Alarm, Emergency lighting and Telephone
About the project
M/s. Buildwell along with the Hypermarket operator; M/s. Madina has developed a Shopping Arcade in Jebel Ali. The shopping arcade has a hypermarket, restaurants and common utility rooms in the ground floor, while the first floor has departmental stores and other retail outlets.
Team Consistent has enhanced its portfolio apart from the MEP and sustainable design to the project management. Complete coordination of the project with M/s. Buildwell (Developer), M/s. Madina (Operator) and the contractor were carried out by Consistent team.
The construction of the project was completed in eight (8) months with all authority connections and approvals. The project was also completed within estimated cost without any major variations.